Case Studies

Divider image

Portishead Police headquarters

Installation and Maintenance | Emergency

 

The challenge

Portishead Police headquarters went to tender to find an experienced commercial electrical contractor to replace their backup generators. Electrio has worked with the police force at Portishead for over 15 years and won the tender based on cost and experience.  

 

The solution

Electrio spent four months planning the detailed electrical design work needed for the project. Some of the information they were sent was based on the headquarter’s original set up and didn’t include changes that had been made over the years. The team went on site to investigate and nail down the electrical specification in order to plan the UPS system and current junctions needed.  

Once they’d confirmed accurate information, they began planning how to implement the system at the headquarters with minimal disruption, including cable rooting and panel design work. 

Electrio took delivery of two 800KVA generators as temporary backups while the team worked to replace the permanent generators and panels. Both the temporary and permanent generators being installed include an SCR system that reduces nitrogen oxide emissions from the diesel engines, making the generators more environmentally friendly. The generators form the independent backup component of the headquarter’s N+1 redundancy, ensuring a power supply if police headquarters lose their mains supply. 

With the temporary generators and panel in place Electrio’s experienced electrical team was able to start work replacing the permanent generators.  

Work is currently ongoing. The team is looking forward to the challenge of switching to the permanent generators with minimal disruption once they’re in place. 

 

“Thank you for your help in being able to complete on time a very difficult project. This was a lot of work condensed into two weeks and without your help could not have been achieved, please pass our gratitude onto all your operatives who took part.”

Operations Manager, MIDAS property services

“I have been asked to pass on the thanks of our CEO for your valuable assistance during the power supply problems of Sunday evening and Monday morning. Please extend this to all members of your team who were involved in the works. ”

Hospital Engineer, Royal United Hospitals, Bath

“I was very impressed with the dedication and commitment of your staff when carrying out the works to a very high standard in very difficult circumstances i.e. reduced working period, additional works and having to work out of sequence to facilitate other trades. I can only thank you again and ask that you pass this on to all of your team. I do not know how you managed to achieve it, but you did.”

Building Officer, North Bristol NHS Trust

accreditation-chas icon
accreditation-dbs icon
accreditation-pasma icon
accreditation-ssip icon
accreditations-niceic icon
accreditations-eca icon
accreditations-safe-contractor icon