BRI Hospital Central Sterile Services Department

LED Lighting | Healthcare

The Challenge

To rewire and update the lighting systems within a central sterile services department (CSSD) in a major hospital, with minimum disruption to the cleaning, disinfecting, and sterilizing of reusable medical equipment.

Our Solution

We worked closely on the refurbishment of the CSSD with the central building contractor, CW Dukes and the lighting designer Connected Light, to rewire the existing installation with a steel conduit, which included a trunking containment system for new lighting and power circuits. To maintain the integrity and cleanliness of the area the new lights were all controlled via Philips PIR detectors.

The project was very challenging firstly because our electricians had to carry out the work whilst the departments continued to operate, because of this we broke the project into phases to suit the needs of the NHS. Where possible, as much preparation work was carried out during the week, allowing this central department to remain operational during normal working hours. Then at the weekends and later in the evening, our electricians were able to complete the final phases.

The second challenge was preserving the sterile environment. Since most of work was conducted within sterile areas, we adopted a managed working system to ensure no cross contamination.

“Clarks Distribution Centre, this job was a great team effort and I am grateful to your Guys for being practical and flexible in what can be a difficult environment. We will be keeping your details on record for future reference and thanks again for all your hard work in bring the LED project to a successful completion ”

Group head of facilities Management - Clarks

“Just to say thank you to all those involved in this project - for delivering the job in time, on budget and to an excellent standard. ”

Business Development & Planning Director, Wiltshire Community Health Services

“Thank you for your help in being able to complete on time a very difficult project. This was a lot of work condensed into two weeks and without your help could not have been achieved, please pass our gratitude onto all your operatives who took part.”

Operations Manager, MIDAS property services