UBHT Bristol Eye Hospital

Design and Specification | Healthcare

The Challenge

Following a competitive tender process Electrio was awarded the contract to upgrade the existing 3200amps Dual Supply Changeover Panel. This included new Low Voltage supplies being taken from existing High Voltage transformers, as well as replacing the sub main distribution panel that feeds the Eye Hospital.

The Solution

All preparation work for the electrical installation was carried during normal hours, whilst the actual sub main supplies feeding clinical areas were transfered over during evenings and weekends to suit clinical departments. 

During the course of this project our electricians encountered additional challenges because of the various modifications that had been carried out previously, over the years, to the existing switchgear. We also discovered that there were different phase rotations between essential and non-essential supplies, along with several borrowed neutrals between supplies. Despite this, we covercame these difficulties to provide a safe installation.

“Just to say thank you to all those involved in this project - for delivering the job in time, on budget and to an excellent standard. ”

Business Development & Planning Director, Wiltshire Community Health Services

“I was very impressed with the dedication and commitment of your staff when carrying out the works to a very high standard in very difficult circumstances i.e. reduced working period, additional works and having to work out of sequence to facilitate other trades. I can only thank you again and ask that you pass this on to all of your team. I do not know how you managed to achieve it, but you did.”

Building Officer, North Bristol NHS Trust

“Electrio provide a first class service and a fully competent support service regarding the planning and co-ordination of the works. I would recommend them to anyone who is considering carrying out similar works. Hospital precincts contain critical service areas and I fully trusted Electrio to maintain these services throughout, they have a conscientious and professional approach and fully appreciate the need to maintain these critical services.”

Senior Engineer, North Bristol NHS Trust