Case Studies

Divider image

Milsom Place Bath

Installation and Maintenance | Retail

The Challenge

Milsom Place in Bath is home to a select range of stylish fashion boutiques, along with several well-known restaurant chains. When it was originally refurbished Electrio installed LED lights in the communal areas. 

Since the installation was completed five years ago, Electrio was asked to conduct an Electrical Condition report in April 2018 in accordance with BS7671 regulations.

The Solution

Businesses must periodically have electrical inspections to ensure they are confirming to the Electricity at Work Regulations 1989, BS 7671. As part of this electrical inspecting and testing, Electrio’s electricians reviewed the fixed wiring system at this busy shopping centre.

Since the shopping centre is open seven days a week, most of the testing was carried out during normal hours. However, several tests, including the isolation of supplies, had to be conducted out of hours to minimise disruption to the business.  

Following tests, several code 2 defects were identified, largely down to deterioration of external items within the installations. These were corrected so that a new satisfactory certificate could be issued.

“Clarks Distribution Centre, this job was a great team effort and I am grateful to your Guys for being practical and flexible in what can be a difficult environment. We will be keeping your details on record for future reference and thanks again for all your hard work in bring the LED project to a successful completion ”

Group head of facilities Management - Clarks

“I have been asked to pass on the thanks of our CEO for your valuable assistance during the power supply problems of Sunday evening and Monday morning. Please extend this to all members of your team who were involved in the works. ”

Hospital Engineer, Royal United Hospitals, Bath

“I was very impressed with the dedication and commitment of your staff when carrying out the works to a very high standard in very difficult circumstances i.e. reduced working period, additional works and having to work out of sequence to facilitate other trades. I can only thank you again and ask that you pass this on to all of your team. I do not know how you managed to achieve it, but you did.”

Building Officer, North Bristol NHS Trust

accreditation-chas icon
accreditation-dbs icon
accreditation-pasma icon
accreditation-ssip icon
accreditations-niceic icon
accreditations-eca icon
accreditations-safe-contractor icon