Electrio won a competitive tender to install N+1 supplies for a new theatre block at Southmead Hospital. The cables were installed on a new cable containment system - previously built by our team -  through a network of underground ducts and newly created cable trenches.

A challenging project

The cables were approximately 180 meters in length, with three x 150mm 4-core cables laid in parallel - which made for a challenging installation. 

We had bespoke panels manufactured to allow for suitable termination points from two different sources. These were fed from two separate transformers and generators, providing a resilient N+1 supply for the new building.

Successful completion 

Much of the work needed to be carried out in a confined working space but our experienced staff rose to the challenge that this brings and the project was successfully completed within a tight time frame.

“Electrio provide a first class service and a fully competent support service regarding the planning and co-ordination of the works. I would recommend them to anyone who is considering carrying out similar works. Hospital precincts contain critical service areas and I fully trusted Electrio to maintain these services throughout, they have a conscientious and professional approach and fully appreciate the need to maintain these critical services.”

Senior Engineer, North Bristol NHS Trust

“Special thanks for the last push over the weekend to complete all of our tasks. Please pass on our thanks to all of your teams, you have done us proud in the project department. Well done.”

Dairy Crest Limited

“I was very impressed with the dedication and commitment of your staff when carrying out the works to a very high standard in very difficult circumstances i.e. reduced working period, additional works and having to work out of sequence to facilitate other trades. I can only thank you again and ask that you pass this on to all of your team. I do not know how you managed to achieve it, but you did.”

Building Officer, North Bristol NHS Trust